On this page
Costs and included work
For tiling, compare the scope first: substrate preparation, tile laying, grouting and edge junctions. A price is useful only when supply and finishing work are clearly defined.
| Work / price basis (from) | Starting indication | Scope |
|---|---|---|
| Tile-laying labour | From € 25 per m² | Labour indication; check tiles, adhesive, grout, waterproofing and VAT separately. |
Market indications checked on 2 October 2026, not fixed Multi Concurrent tariffs. The stated work and unit apply; the quotation confirms the total, VAT and any additional work.
What affects your total?
Tile size, pattern, cutting, levelling and waterproofing affect labour. Laying labour is not a complete tiled floor including tiles, adhesive, grout and skirtings.
What to send with your request
Send floor and wall areas, tile size, laying pattern and substrate photos. Include your postcode, preferred schedule and the elements that must remain, so the scope can be assessed.
Wall and floor tiling
Begin with the room, tile type, format and laying pattern. The substrate must be suitable for the selected system. Existing adhesive, unevenness, movement and moisture can affect preparation.
Wet areas need a complete system
Bathroom waterproofing includes corners, penetrations, drains and movement joints. Agree the full build-up before tiling. The visible tiles and grout are only part of the specification.
Set out the layout before fixing
Large tiles, niches and patterns influence cutting and junctions. Record tile size, joint width and alignment. Order using the measured area and an appropriate cutting allowance, and keep spare tiles from the same batch.
Compare labour and materials separately
A laying-only price is different from a complete tiled bathroom. Include preparation, waterproofing, adhesive, grout, trims and disposal where required. The tiling cost guide explains the items to compare.
Explore services and costs
From preparation to handover
The sequence is tailored to your project. See what is prepared, carried out and checked at handover.
Use and tile choice
Agree which wall or floor will be tiled, how the room will be used and the desired finish.
Assess the substrate
Check flatness, existing layers, height differences and connections to other elements.
Layout and details
Discuss tile size, pattern, joint width, edges and the position of cut tiles.
Quote and materials
Specify preparation, tiles, cutting allowance, profiles, grout and sealant separately.
Prepare the work area
Remove existing finishes where agreed and protect adjacent elements.
Prepare the substrate
Complete the repairs, levelling or priming required for the selected system.
Prepare wet areas
Provide waterproofing and connections where needed as part of the complete system.
Lay the tiles
Install tiles to the agreed layout and product instructions.
Grout and joints
After the required waiting time, complete grouting, edges and movement joints.
Handover and maintenance
Review the layout, joints, connections and advice on use and cleaning.
Frequently asked questions
When is the tile layout decided?
Agree size, direction, joints and sight lines before installation. Account for corners, recesses and junctions so cut pieces and transitions are planned.
Does the surface always need levelling?
Not automatically, but it must suit the selected tile and adhesive system. Have flatness, stability and moisture assessed, and specify any necessary preparation separately.
When can a tiled room be used again?
This depends on the materials and conditions. Follow drying and curing requirements for adhesive, grout and sealant, and coordinate use or underfloor heating start-up accordingly.
