Demolition and structural work

Make room for your renovation with controlled demolition and carefully prepared structural alterations.

On this page

Costs and included work

For demolition and structural work, compare the scope first: defined scope, safe preparation, dismantling and waste removal. A price is useful only when supply and finishing work are clearly defined.

Work / price basisStarting indicationScope
Demolition and structural workPrice on requestDefined scope, safe preparation, dismantling and waste removal

What affects your total?

Structural function, services, unidentified materials, floor level and waste routes determine the approach. Structural calculations, temporary support, reinstatement and any surveys are specified separately.

What to send with your request

Send photos, measurements, floor level, access and the elements that must remain. Include your postcode, preferred schedule and the elements that must remain, so the scope can be assessed.

Define what is removed and retained

Demolition is part of the next building phase. Mark walls, floor layers, sanitary fittings and other components to remove, and identify what must stay. Clear boundaries help protect the rest of the building.

Assess structural and material risks

Load-bearing walls, chimney sections and structural openings require project-specific assessment. A structural engineer determines any permanent and temporary support. Have unidentified or suspected hazardous materials assessed before disturbing them.

Prepare the site and service isolation

Agree who isolates the affected utilities, how access routes are protected and where waste will be stored. Plan dust control, transport and any temporary facilities. Permissions and notifications must be checked for the actual scope and location.

Hand over a usable work area

Remove materials through the agreed waste routes, inspect exposed substrates and record remaining work. Bathroom, kitchen, chimney and whole-house demolition each have a dedicated sequence in the knowledge base.

Explore services and costs

From preparation to handover

The sequence is tailored to your project. See what is prepared, carried out and checked at handover.

Demolition work

  1. Site survey and scope of demolition

    Agree what will be removed, what will remain and how the building will be used during the work.

  2. Investigate the existing building

    Have load-bearing elements, service routes and suspect materials assessed before work begins.

  3. Required documents

    Establish which drawings, investigations and permissions the work requires.

  4. Quote and waste removal

    Itemise the work, protection, waste separation, transport and repairs.

  5. Prepare the work area

    Agree access, dust control and protection of retained elements.

  6. Make services safe

    Have the relevant services disconnected or protected by suitable professionals.

  7. Controlled demolition

    Remove the agreed elements carefully and discuss unexpected conditions before proceeding.

  8. Waste removal

    Separate the agreed waste streams and remove them via the planned route.

  9. Assess the substrate

    Check whether the exposed condition supports the assumptions for the next phase.

  10. Handover

    Review the extent of demolition, remaining issues and arrangements with the finishing contractor.

Removing a load-bearing wall

  1. Requirements

    Discuss the desired opening and new layout.

  2. Structural engineer

    Have the existing loads and load paths assessed.

  3. Calculations

    Design the beam, bearings and any columns needed.

  4. Permit check

    Check which permissions the alteration requires.

  5. Preparation

    Agree the temporary support plan, materials and work area.

  6. Temporary support

    Support the structure in accordance with the project-specific plan.

  7. Making the opening

    Form the opening in a controlled way.

  8. Steel installation

    Install the supporting structure and bearings to the design.

  9. Inspection

    Have the work checked before temporary support may be removed.

  10. Finishing

    Complete connections, fire protection and visible finishes.

Frequently asked questions

How do we decide what will be removed?

Use photographs or drawings with a clear demolition boundary. Record which structural elements, services and finishes remain, and which parts require investigation first.

What happens if there is uncertainty about structure or asbestos?

Have the affected element professionally assessed before demolition starts there. A photograph or wall thickness alone is not enough to establish structural safety or whether asbestos is present.

Is waste removal included in demolition work?

Only when it is part of the agreed scope. Discuss waste types, quantities, containers, removal routes and the condition in which the space should be handed over.