Decide what will stay
List cabinets, appliances, worktops and fittings for reuse, sale or disposal. Agree who disconnects, moves and stores them, and whether the removal method is intended to preserve individual items.
Coordinate the installations
An appropriate tradesperson should assess and make safe electrical, gas, water and waste connections. The new kitchen drawings help establish which service positions must change before installation.
What belongs in the price?
Include floor and wall finishes, waste handling, access and making good where required. A cabinet-removal price may exclude tiles, plaster, pipework and structural changes.
Inspect before rebuilding
Once the room is exposed, check substrates, moisture and service routes. Confirm dimensions and finished levels with the kitchen installer before closing walls or ordering components that rely on exact measurements.
Kitchen demolition: the work sequence
Removing a kitchen requires coordination with the new layout, supplier and installers. Agree whether any components are intended for reuse.
Define the new layout
Compare the kitchen design with the existing cabinets, worktop, floor and service connections.
Agree what to remove and retain
Record which appliances and building components will stay and which wall or floor layers will be removed.
Prepare services and the work area
Have the relevant trades safely isolate the connections. Arrange protection and temporary cooking facilities.
Dismantle the components
The contractor removes the agreed items and sets aside material intended for reuse.
Check the exposed base and pipework
Discuss visible damage and discrepancies before installing new pipe routes and finishes.
Ready for the next phase
Check waste removal, outstanding work and the measurements needed for preparation and kitchen installation.