Services planned around the renovation
Electrical, water, heating and ventilation changes should follow the new layout and equipment choices. Record appliance requirements and connection positions before walls and floors are finished.
Assess the existing installation
An electrician assesses circuits, protective devices and supply needs. Plumbing work depends on routes, drainage and access. Any changes to the incoming utility supply need coordination with the relevant network operator.
Coordinate installation and checks
Agree safe isolation, new routes and responsibilities between trades. Schedule checks before concealed work is closed up. Keep relevant route information and completion documentation with the project file.
Define the scope and price
Separate labour, components, call-out charges and reinstatement. A low hourly rate does not establish the cost of a complete installation. Discuss the proposed work so the required specialists and planning can be identified.
Explore services and costs
From preparation to handover
The sequence is tailored to your project. See what is prepared, carried out and checked at handover.
Assess requirements
List appliances, heating requirements, water outlets and ventilation needs.
Assess existing services
Have suitable specialists assess capacity, connections, routes and access.
Coordinated installation plan
Agree the positions of pipes, equipment and controls across the relevant trades.
Quote and scope
Specify the work, products, inspections, making good and any work by third parties.
Plan interruptions
Agree when electricity, water or heating will temporarily be unavailable.
Prepare service routes
Coordinate openings and building provisions before pipes and cables are installed.
Installation
Have suitable professionals carry out the agreed installation work.
Inspect before closing up
Complete the required checks and record the positions of concealed components.
Connect and commission
Connect and adjust equipment and have its operation checked.
Handover
Discuss operation, relevant test and product records, maintenance and follow-up arrangements.
Frequently asked questions
When should services be included in the building plan?
Before closing floors, walls and ceilings. Layout, capacity, service routes and equipment positions determine the preparation required.
Can existing building services be extended?
The existing installation and intended use need assessment. Have a suitable installer determine which parts can remain and what extensions, alterations or replacement are required.
What should be covered at handover of building services?
Agree checks, settings, operating instructions and available documentation. Record outstanding items before connections or technical components are concealed by finishes.