Electrical, water, heating and ventilation work as part of a well-prepared renovation.

On this page

Services planned around the renovation

Electrical, water, heating and ventilation changes should follow the new layout and equipment choices. Record appliance requirements and connection positions before walls and floors are finished.

Assess the existing installation

An electrician assesses circuits, protective devices and supply needs. Plumbing work depends on routes, drainage and access. Any changes to the incoming utility supply need coordination with the relevant network operator.

Coordinate installation and checks

Agree safe isolation, new routes and responsibilities between trades. Schedule checks before concealed work is closed up. Keep relevant route information and completion documentation with the project file.

Define the scope and price

Separate labour, components, call-out charges and reinstatement. A low hourly rate does not establish the cost of a complete installation. Discuss the proposed work so the required specialists and planning can be identified.

Explore services and costs

From preparation to handover

The sequence is tailored to your project. See what is prepared, carried out and checked at handover.

  1. Assess requirements

    List appliances, heating requirements, water outlets and ventilation needs.

  2. Assess existing services

    Have suitable specialists assess capacity, connections, routes and access.

  3. Coordinated installation plan

    Agree the positions of pipes, equipment and controls across the relevant trades.

  4. Quote and scope

    Specify the work, products, inspections, making good and any work by third parties.

  5. Plan interruptions

    Agree when electricity, water or heating will temporarily be unavailable.

  6. Prepare service routes

    Coordinate openings and building provisions before pipes and cables are installed.

  7. Installation

    Have suitable professionals carry out the agreed installation work.

  8. Inspect before closing up

    Complete the required checks and record the positions of concealed components.

  9. Connect and commission

    Connect and adjust equipment and have its operation checked.

  10. Handover

    Discuss operation, relevant test and product records, maintenance and follow-up arrangements.

Frequently asked questions

When should services be included in the building plan?

Before closing floors, walls and ceilings. Layout, capacity, service routes and equipment positions determine the preparation required.

Can existing building services be extended?

The existing installation and intended use need assessment. Have a suitable installer determine which parts can remain and what extensions, alterations or replacement are required.

What should be covered at handover of building services?

Agree checks, settings, operating instructions and available documentation. Record outstanding items before connections or technical components are concealed by finishes.