Installation work: the step-by-step guide

Coordinate electricity, water, heating and ventilation before walls and floors are closed.

An overview of preparation, construction and handover. The exact sequence depends on your property, design and scope. Structural work and installations require a project-specific assessment.

Define the scope firstNot every job involves every trade. Moving a socket has a narrower scope than a whole-home renovation. The specialist determines the required checks, coordinated with demolition, wall construction and flooring.

Building services in 10 steps

  1. Assess requirements

    List appliances, heating requirements, water outlets and ventilation needs.

  2. Assess existing services

    Have suitable specialists assess capacity, connections, routes and access.

  3. Coordinated installation plan

    Agree the positions of pipes, equipment and controls across the relevant trades.

  4. Quote and scope

    Specify the work, products, inspections, making good and any work by third parties.

  5. Plan interruptions

    Agree when electricity, water or heating will temporarily be unavailable.

  6. Prepare service routes

    Coordinate openings and building provisions before pipes and cables are installed.

  7. Installation

    Have suitable professionals carry out the agreed installation work.

  8. Inspect before closing up

    Complete the required checks and record the positions of concealed components.

  9. Connect and commission

    Connect and adjust equipment and have its operation checked.

  10. Handover

    Discuss operation, relevant test and product records, maintenance and follow-up arrangements.

What should you prepare for the site visit?

List the appliances and facilities required in each location. Share existing installation drawings, product details and the new layout. Have capacity and connection options assessed; choosing an appliance is not the same as designing its installation.

Which documents should you keep?

Keep available drawings and photographs of concealed service routes. Request relevant inspection and product information and operating guidance. Discuss maintenance responsibility and who to contact if a fault occurs.

Frequently asked questions

When can walls and floors be closed?

Coordinate this after the relevant installer has completed the necessary checks and important concealed details have been recorded. The finishing trade must know which areas need to remain accessible.