On this page
Costs and included work
For roofing, compare the scope first: roof area, covering system, substrate and junction details. A price is useful only when supply and finishing work are clearly defined.
| Work / price basis (from) | Starting indication | Scope |
|---|---|---|
| Bitumen roof covering | From € 50 per m² | Market indication including VAT and fitting; substrate repairs and extras separate. |
Market indications checked on 2 October 2026, not fixed Multi Concurrent tariffs. The stated work and unit apply; the quotation confirms the total, VAT and any additional work.
What affects your total?
Removal of old layers, decking repairs, insulation, edge details, drainage and scaffolding are assessed separately. A covering price is not a price for replacing the entire structural roof.
What to send with your request
Send roof area, material, known age, photos and information about roof access. Include your postcode, preferred schedule and the elements that must remain, so the scope can be assessed.
Inspect the roof before selecting work
A leak, worn covering or insulation upgrade can lead to different scopes. Assess the roof covering, decking, supporting structure, junctions and moisture signs. Replacing the waterproof layer is different from rebuilding the complete roof.
Choose a compatible roof system
Bitumen, EPDM, PVC and roof tiles have different applications. Consider the complete build-up, including insulation, vapour control, edges, drainage and penetrations. Individual layers need to work together.
Plan safe access and weather protection
Roof work depends on access, height, surrounding buildings and weather. Agree scaffolding or other access provisions, temporary waterproofing and waste removal before opening the roof.
Compare the complete scope
Specify removal, repairs, insulation, new covering, junctions and finishing. The roof cost pages give indicative ranges; a survey establishes the work for your property. Review maintenance points at handover.
Explore services and costs
From preparation to handover
The sequence is tailored to your project. See what is prepared, carried out and checked at handover.
Inspection
Assess damage, roof details and signs of moisture.
Repair or replace
Establish whether repair or replacement is appropriate.
Quote
Specify the layers, insulation, edges and drainage.
Preparation
Arrange safe access and plan for weather conditions.
Removal
Remove the agreed existing layers in a controlled way.
Substrate
Assess the roof deck and supporting structure.
Insulation
Install insulation and vapour control layers to the design.
Roof covering
Install the new waterproof layer and details.
Connections
Complete drainage, roof edges and penetrations.
Handover
Inspect the work and explain maintenance requirements.
Frequently asked questions
How do I choose between roof repair and replacement?
Have the cause of the problem and condition of the roof layers assessed. Then ask which repair options are possible, what they address and when replacement would be more appropriate.
Which roof details should a quote cover?
Include roof edges, drains, penetrations and junctions with façades or chimneys. Specify which elements will be renewed, retained or investigated further.
When should I discuss insulation during roofing work?
Before choosing the new roof build-up. Insulation affects layers and junctions. The appropriate combination depends on the existing structure and how the building is used.
