On this page
Moving an existing point or creating a new route
When relocating a socket, the electrician assesses whether the existing installation is suitable. A new route may require extra cable, conduit and repairs. The electrician determines the appropriate connection.
Recessed or surface-mounted fittings
Recessed fittings have a different appearance but often require chases and wall repairs. Surface mounting may be more practical in some rooms. Include finishing explicitly in the scope.
Plan sockets before plastering
Agree furniture positions, worktop heights, equipment and switches early. This avoids cutting new chases into recently finished walls.
A new connection point or a moved socket?
Mark the intended connection and appliance on a floor plan. Have the electrician assess the suitable connection. Ask whether the old point is removed, reused or made good. This avoids pricing only the new socket while leaving repairs to the previous position outside the quotation.
Concealed wiring, surface mounting and wall repairs
The desired finish affects the work. For concealed wiring, ask about opening and repairing the wall. An electrical price does not automatically include plastering, painting or tile repairs. In a kitchen or bathroom, the final layout helps ensure that connections are prepared in the right places.
Several connection points in one appointment
Provide all planned alterations together. The electrician can then assess the existing installation, routes and materials as one project. Compare the same finishing and testing scope. Per-point rates are only comparable when distance, access and connection type are equivalent.
Frequently asked questions
Does the price include plastering and painting afterwards?
Only if agreed. Specify installation, wall repairs and final decoration separately in the quotation.
Is the price on this page a quote?
No. An estimate or worked example is for initial planning. The property, materials and agreed scope determine your quote.
What should I include in a quote request?
Describe the work and include the town, postcode, photographs, dimensions and any available drawings. Add your preferred start period. Larger projects need a site visit to establish the scope and price.
Do I need a permit?
This depends on the work, the address and local rules. Check your plan through the Dutch Omgevingsloket and have structural alterations assessed in advance. Work that does not need a permit must still comply with applicable building rules.
