An overview of preparation, construction and handover. The exact sequence depends on your property, design and scope. Structural work and installations require a project-specific assessment.
Demolition in 10 steps
Site survey and scope of demolition
Agree what will be removed, what will remain and how the building will be used during the work.
Investigate the existing building
Have load-bearing elements, service routes and suspect materials assessed before work begins.
Required documents
Establish which drawings, investigations and permissions the work requires.
Quote and waste removal
Itemise the work, protection, waste separation, transport and repairs.
Prepare the work area
Agree access, dust control and protection of retained elements.
Make services safe
Have the relevant services disconnected or protected by suitable professionals.
Controlled demolition
Remove the agreed elements carefully and discuss unexpected conditions before proceeding.
Waste removal
Separate the agreed waste streams and remove them via the planned route.
Assess the substrate
Check whether the exposed condition supports the assumptions for the next phase.
Handover
Review the extent of demolition, remaining issues and arrangements with the finishing contractor.
What should you prepare for the site visit?
Send overview photographs, available drawings and a list of elements to retain. State whether the property remains occupied or in use. Have unknown construction and materials assessed before opening them up.
Which documents should you keep?
At handover, record what was removed, what remains and any defects revealed during the work. Establish whether the exposed substrate is ready for the next trade or requires repairs first.
Frequently asked questions
Is removing a load-bearing wall ordinary demolition work?
No. Work on load-bearing elements requires project-specific structural assessment and execution. The general demolition process does not replace that preparation.