An overview of preparation, construction and handover. The exact sequence depends on your property, design and scope. Structural work and installations require a project-specific assessment.
Kitchen renovation in 11 steps
Agree the layout
Coordinate cabinets, appliances, worktop, circulation space and required connections.
Survey the existing kitchen
Have dimensions, walls, floor, water, drainage, ventilation and electricity assessed.
Final installation drawing
Use the kitchen supplier’s final information as the basis for preparation.
Quote and deliveries
Define the construction and supply responsibilities, then plan delivery, installation and temporary facilities.
Remove the old kitchen
Have services safely disconnected and the agreed elements dismantled and removed.
Building preparation
Make the agreed wall and floor alterations, with structural changes assessed in advance.
Adapt the services
Have suitable specialists prepare the connection points and service routes.
Finish walls and floors
Prepare surfaces and finishes around the kitchen installation sequence and drying times.
Fit the kitchen and worktop
Measure and install the ordered components in line with the supply agreement.
Connect and test
Connect appliances, water and drainage and have their operation checked.
Handover
Inspect doors, drawers, connections, finishes and any outstanding items together.
What should you prepare for the site visit?
Use the final kitchen design and installation plan, including dimensions and appliances. Clarify who supplies, fits and connects the kitchen. Discuss cooking and washing-up arrangements while it is out of use.
Which documents should you keep?
Inspect cabinets, drawers, doors, worktops and visible finishes. Have the relevant trades check connections and appliances. Keep product information, connection details and agreements for items supplied later.
Frequently asked questions
Can preparation start before the kitchen plan is final?
An initial survey can take place, but dimensions and connection points require the supplier's final information. Changes after installation can lead to repairs and additional work.