Load-bearing wall removal: the step-by-step guide

Follow the load-bearing wall removal process, from the initial survey to handover.

An overview of preparation, construction and handover. The exact sequence depends on your property, design and scope. Structural work and installations require a project-specific assessment.

Load-bearing wall removal in 10 steps

  1. Requirements

    Discuss the desired opening and new layout.

  2. Structural engineer

    Have the existing loads and load paths assessed.

  3. Calculations

    Design the beam, bearings and any columns needed.

  4. Permit check

    Check which permissions the alteration requires.

  5. Preparation

    Agree the temporary support plan, materials and work area.

  6. Temporary support

    Support the structure in accordance with the project-specific plan.

  7. Making the opening

    Form the opening in a controlled way.

  8. Steel installation

    Install the supporting structure and bearings to the design.

  9. Inspection

    Have the work checked before temporary support may be removed.

  10. Finishing

    Complete connections, fire protection and visible finishes.

Which documents should you keep?

Keep the agreed scope, drawings, calculations where applicable, material specifications and handover notes together. This provides a clear record of the work for future reference.