On this page
Costs and included work
For removing a chimney: preparation, costs and work involved, compare the scope first: defined scope, safe preparation, dismantling and waste removal. A price is useful only when supply and finishing work are clearly defined.
| Work / price basis | Starting indication | Scope |
|---|---|---|
| Removing a chimney: preparation, costs and work involved | Price on request | Defined scope, safe preparation, dismantling and waste removal |
What affects your total?
Removing only the stack above the roof differs from removing the entire flue; structural function and roof repairs are assessed separately. Structural function, services, unidentified materials, floor level and waste routes determine the approach. Structural calculations, temporary support, reinstatement and any surveys are specified separately.
What to send with your request
Send photos, measurements, floor level, access and the elements that must remain. Include your postcode, preferred schedule and the elements that must remain, so the scope can be assessed.
Check the whole chimney
A chimney breast, stack and flue form connected parts of the building. Establish which sections are shared, still in use or supported by other construction. A visible section cannot be assessed in isolation.
Structure and permissions
Ask a structural engineer to determine the consequences of the proposed removal and any permanent or temporary support. Check the address and scope in the Omgevingsloket, including monument and shared-property considerations.
Plan the removal
Agree safe access, protection, dust control and handling of unknown materials before dismantling starts. Roof work requires a weather plan and a clear arrangement for closing the opening.
Complete the repair
Include roof covering, insulation, fire separation and internal finishes where affected. Inspect the repaired junctions and record any work still needed before handing the space back for decoration.
Chimney removal: preparation and construction
The fireplace surround, flue and roof section may form a single structural intervention. Have the entire route assessed even if you only want one section removed.
Survey the route and scope
Map the sections running through the home and identify exactly what must be removed.
Assess the structure and materials
Have a specialist assess retained sections, support, connections and unidentified materials.
Agree the plan and reinstatement
Agree the required permissions, access, disposal, roof repairs and internal finishes.
Prepare the work
The contractor arranges the designed provisions, safe access and protection of the surroundings.
Controlled removal
Qualified trades carry out the agreed removal and waste handling according to the project plan.
Complete roof and interior work
Check repaired junctions, retained components and the handover to the next trade.
