An overview of preparation, construction and handover. The exact sequence depends on your property, design and scope. Structural work and installations require a project-specific assessment.
Tiling in 10 steps
Use and tile choice
Agree which wall or floor will be tiled, how the room will be used and the desired finish.
Assess the substrate
Check flatness, existing layers, height differences and connections to other elements.
Layout and details
Discuss tile size, pattern, joint width, edges and the position of cut tiles.
Quote and materials
Specify preparation, tiles, cutting allowance, profiles, grout and sealant separately.
Prepare the work area
Remove existing finishes where agreed and protect adjacent elements.
Prepare the substrate
Complete the repairs, levelling or priming required for the selected system.
Prepare wet areas
Provide waterproofing and connections where needed as part of the complete system.
Lay the tiles
Install tiles to the agreed layout and product instructions.
Grout and joints
After the required waiting time, complete grouting, edges and movement joints.
Handover and maintenance
Review the layout, joints, connections and advice on use and cleaning.
What should you prepare for the site visit?
Include tile size, pattern, grout colour, edges and thresholds in the layout. Mention wet areas and underfloor heating. Agree who orders tiles and how cutting waste, breakage and later deliveries are handled.
Which documents should you keep?
Inspect the layout, cut tiles, grout and junctions together. Discuss when surfaces can be used and suitable cleaning methods. Keep details of tiles, grout and waterproofing products for maintenance and repairs.
Frequently asked questions
Is waterproofing included with bathroom tiling?
It must be explicitly included in the scope. Have the necessary waterproofing and junctions assessed and specified together with the tile system.