On this page
Costs and included work
For having solar panels installed, compare the scope first: panel layout, modules, inverter, cabling and safe connection. A price is useful only when supply and finishing work are clearly defined.
| Work / price basis | Starting indication | Scope |
|---|---|---|
| Having solar panels installed | Price on request | Panel layout, modules, inverter, cabling and safe connection |
What affects your total?
Roof condition, shading, cable routes and the distribution board affect installation. Compare system capacity and included installation; a module price is not a fully connected system.
What to send with your request
Send annual consumption, roof dimensions, orientation and photos of the roof and distribution board. Include your postcode, preferred schedule and the elements that must remain, so the scope can be assessed.
Roof and cable routes first
Have roof condition and suitability assessed before scheduling installation. Discuss insulation, penetrations, access and the route to the inverter and distribution board. Existing structural drawings help identify the assessment required.
Survey and handover
Survey the roof and electrical installation together. Record design, products, fitting, connection, checks and handover. At completion request the relevant installation information, operating instructions and agreed warranty documents.
Net metering and self-consumption
Dutch net metering ends on 1 January 2027. A new installation assessment should therefore include the situation without net metering. Purchase cost, self-consumption, export compensation and export charges affect the result; a fixed return or payback period does not apply to every home.
Comparing complete quotations
Compare panel number and capacity, inverter, mounting system, cable route, distribution-board changes and commissioning checks. Record any roof work, scaffolding or access requirements. Ask for a clear distinction between supply, installation, extras and maintenance and warranty terms.
