An overview of preparation, construction and handover. The exact sequence depends on your property, design and scope. Structural work and installations require a project-specific assessment.
Painting and decorating in 10 steps
Colour and result
Agree the rooms or exterior elements, colours and desired appearance.
Assess the substrate
Investigate existing coatings, moisture marks, damage and any timber decay.
Choose the system
Match the product, sheen and method to the substrate and its use.
Quote and planning
Itemise preparation, coats, protection, access and finishing.
Protect the work area
Cover furniture and vulnerable elements and mask edges carefully.
Prepare the substrate
Carry out the agreed cleaning, repairs and sanding in line with the paint system.
Primer or intermediate coat
Apply the preparatory coats required by the selected system.
Apply the finish coats
Apply the selected finish and observe the product-specific drying times.
Inspect and clean up
Check coverage, colour, edges and repair points, then clean the work area.
Discuss maintenance
Provide colour and product details and explain when the finish is ready for normal use.
What should you prepare for the site visit?
List the surfaces and existing damage. Discuss colour, product and sheen using a sample. Identify rooms that must remain accessible and furniture or floors that need protection.
Which documents should you keep?
Record products, colour codes, the agreed finish and any outstanding items. Discuss drying or curing before cleaning or normal use. Instructions depend on the product and conditions.
Frequently asked questions
Should I do all the masking or sanding myself?
Only undertake preparation agreed in advance. The decorator must be able to assess whether it is suitable for the chosen coating system.
