Extensions · Roof extensions · Renovation

Blocked drain clearance costs

Blockage-clearance costs depend on the location, cause and access to the affected drain. Clearing a local obstruction is different from repairing a damaged pipe.

On this page

Costs and included work

For blocked drain clearance costs, compare the scope first: diagnosis, labour, parts and checking the pipework. A price is useful only when supply and finishing work are clearly defined.

Work / price basis (from)Starting indicationScope
Scheduled plumbing: labourFrom € 45 per hourExcludes VAT; specify parts, travel and making good separately.

Market indications checked on 2 October 2026, not fixed Multi Concurrent tariffs. The stated work and unit apply; the quotation confirms the total, VAT and any additional work.

What affects your total?

Pipe diameter, location, access and cause determine the method; agree camera inspection and any repair separately. Locating a fault and repairing it are separate tasks. Travel, opening up surfaces, isolation and reconnection, and making good walls or floors are specified in the quotation.

What to send with your request

Send photos, connection locations, a description of the fault and access information. Include your postcode, preferred schedule and the elements that must remain, so the scope can be assessed.

Price basis and further informationHomedeal: loodgieter

Describe the symptoms

Explain which fixtures are affected, whether water backs up elsewhere and whether the problem recurs. This helps the drainage specialist plan an appropriate investigation.

Understand the proposed work

Ask what attendance and clearance include, and whether further investigation is charged separately. Camera inspection or repairs may be appropriate where the cause is unresolved.

Confirm the result

The contractor should check flow after treatment and explain any remaining issue. A temporarily clear drain does not automatically prove that damaged pipework or another underlying cause has been repaired.

What are you planning to build?

Tell us about your plans. We will help you work out the next step.

Discuss your project
Call usRequest a quote