Roof extensions: the step-by-step guide

Follow the roof extensions process, from the initial survey to handover.

An overview of preparation, construction and handover. The exact sequence depends on your property, design and scope. Structural work and installations require a project-specific assessment.

Roof extensions in 12 steps

  1. Space requirements

    Decide which new rooms and usable floor area you need.

  2. Site survey

    Assess the existing roof, load paths and access.

  3. Design

    Develop the height, façades, daylight provision and stairs.

  4. Structural design

    Have the additional loads and their transfer through the building calculated.

  5. Permits

    Have the design and local rules assessed.

  6. Quote

    Itemise the shell structure, installations, finishing and lifting work.

  7. Construction planning

    Plan the lifting position, suitable weather conditions and temporary protection.

  8. Opening the roof

    Open the roof in a controlled way and protect the home.

  9. Installing the structure

    Build the walls and roof in accordance with the structural design.

  10. Weatherproofing

    Complete the windows, doors, roof covering and connection details.

  11. Interior work

    Install the stairs, services, insulation and interior finishes.

  12. Handover

    Inspect the connections and finishes together.

Which documents should you keep?

Keep the agreed scope, drawings, calculations where applicable, material specifications and handover notes together. This provides a clear record of the work for future reference.