An overview of preparation, construction and handover. The exact sequence depends on your property, design and scope. Structural work and installations require a project-specific assessment.
Roof extensions in 12 steps
Space requirements
Decide which new rooms and usable floor area you need.
Site survey
Assess the existing roof, load paths and access.
Design
Develop the height, façades, daylight provision and stairs.
Structural design
Have the additional loads and their transfer through the building calculated.
Permits
Have the design and local rules assessed.
Quote
Itemise the shell structure, installations, finishing and lifting work.
Construction planning
Plan the lifting position, suitable weather conditions and temporary protection.
Opening the roof
Open the roof in a controlled way and protect the home.
Installing the structure
Build the walls and roof in accordance with the structural design.
Weatherproofing
Complete the windows, doors, roof covering and connection details.
Interior work
Install the stairs, services, insulation and interior finishes.
Handover
Inspect the connections and finishes together.
Which documents should you keep?
Keep the agreed scope, drawings, calculations where applicable, material specifications and handover notes together. This provides a clear record of the work for future reference.
