An investigation suited to the planned work
A complete renovation requires different information from an assessment of one visible component. Provide existing drawings and earlier reports. Ask whether additional visits or analysis may be needed and how these would be priced.
What should the report make clear?
Read the scope, materials found and exclusions. Discuss whether the report is suitable for the planned work. Inaccessible components may require further investigation.
Separate the survey from removal
A survey establishes the situation; removal is a separate commission. Ask about the relevant certification and verify it with the responsible organisation. Keep the report for project preparation and construction.
