An overview of preparation, construction and handover. The exact sequence depends on your property, design and scope. Structural work and installations require a project-specific assessment.
House extensions in 12 steps
Initial discussion
Discuss your requirements, intended use, address and budget.
Site survey
Assess the property, access and connections to the existing building.
Design
Agree the layout, natural light, appearance and materials.
Structural design
Design the foundations, opening and supporting structure.
Permits
Check the location and design through the Omgevingsloket.
Quote
Discuss the scope, provisional allowances, exclusions and price.
Preparation
Arrange the schedule, site logistics, deliveries and protection.
Foundations
Build the foundations in accordance with the project-specific design.
Shell structure
Construct the floors, walls, windows, doors and roof.
Installations
Coordinate electricity, water, heating and ventilation.
Finishing
Complete plastering, painting and floor finishes.
Handover
Inspect the work and agree how any outstanding items will be addressed.
Which documents should you keep?
Keep the agreed scope, drawings, calculations where applicable, material specifications and handover notes together. This provides a clear record of the work for future reference.
